Intelli-BuildAI by OAIRO

DEWA Bill Analysis for Commercial Buildings

Turn DEWA bills into an energy, cost and carbon baseline for your Dubai commercial building — spotting cooling waste, benchmarking EUI against CIBSE TM46 and quantifying the retrofit Green Premium.

The challenge

Dubai commercial building operators receive DEWA electricity and, where applicable, district cooling bills each month — but without a structured benchmarking process, it is difficult to assess whether consumption is efficient or excessive, or to identify which systems are driving cost.

How Intelli-BuildAI helps

Intelli-BuildAI analyses DEWA bill data to calculate indicative EUI, benchmark performance against CIBSE TM46 and UAE Green Building Regulations, identify cooling waste and estimate the Green Premium available from retrofit. Where BMS or additional data is available, the analysis can be deepened.

  • DEWA bill EUI calculation and sector benchmarking
  • Indicative energy waste estimate
  • UAE Green Building Regulations alignment check
  • Cooling cost analysis and efficiency assessment (indicative)
  • Carbon exposure based on DEWA emission factors
  • Green Premium uplift estimate from retrofit
  • Prioritised action plan for cost and carbon reduction

Referenced against recognised standards & frameworks

CIBSE TM46ASHRAE 90.1CRREMUAE Green Building RegulationsEstidama

Frequently asked questions

What DEWA data do I need to provide?

Monthly DEWA electricity bills covering at least 12 months and the building's gross floor area are sufficient to produce a preliminary scan. Additional data improves accuracy.

How quickly do I get results, and what does it cost?

A structured scan is returned within 48 hours, and the first building scan is free.

Does Intelli-BuildAI access DEWA data directly?

No. You upload your DEWA bills directly through the platform. We do not connect to DEWA systems.

Which benchmarks are DEWA figures compared against?

Consumption is normalised to EUI in kWh/m²/yr and benchmarked against CIBSE TM46 categories and ASHRAE references, with carbon intensity compared against CRREM pathways using DEWA emission factors, documented by source and year.

Are district cooling charges included?

Yes. District cooling consumption can be included alongside DEWA electricity so cooling intensity is assessed on a whole-building basis.

How is the bill data extracted and checked?

The ingestion engine reads each uploaded bill, extracts consumption and tariff values with a confidence score and evidence reference, and presents them for your explicit approval before anything is committed — every input is flagged verified or estimated in the project's evidence register.

Can Intelli-BuildAI help reduce DEWA bills?

The scan identifies where energy consumption may be higher than expected, ranks interventions by indicative payback, and — once measures are implemented — performance drift detection verifies the reduction against metered data rather than assuming it.

Start with one building.

Upload one utility bill, EPC or BMS export and receive a structured opportunity scan.

Back to Intelli-BuildAI

© Intelli-BuildAI by OAIRO. Assessment outputs are indicative and subject to data quality.